Healthcare · NHS

Clatterbridge Cancer Centre

New high-power supply pulled in to the main kitchen

Wirral · NHS
NHS hospital building on the Wirral

We ran a new, large-diameter supply cable from the site substation through to the main kitchen — a high-power feed sized for the heavy, continuous loads that commercial catering equipment demands.

The cable was terminated and the kitchen power brought safely into service, supplying the facilities that cater for both patients and visitors. Working on a live healthcare site, the work was planned around the estate so day-to-day services carried on uninterrupted.